Pre-manufacturing (non structural assemblies and sub-assemblies)
Modern Methods of Construction, Introducing the MMC definition framework, published by Ministry of Housing, Communities & Local Government (MHCLG) in 2019 defines 7 categories for MMC:
- Category 1 – Pre-manufacturing (3D primary structural systems).
- Category 2 – Pre-manufacturing (2D primary structural systems).
- Category 3 – Pre-manufacturing components (non-systemised primary structure).
- Category 4 – Additive manufacturing (structural and non-structural)
- Category 5 – Pre-manufacturing (non structural assemblies and sub-assemblies).
- Category 6 – Traditional building product led site labour reduction / productivity improvements.
- Category 7 – Site process led site labour reduction / productivity / assurance improvements.
Category 5 – Pre-manufacturing (non structural assemblies and sub-assemblies) is defined as:
‘A series of different pre-manufacturing approaches that includes unitised non-structural walling systems, roofing finish cassettes or assemblies (where not part of a wider structural building system), non-load bearing mini-volumetric units (sometimes referred to as ‘pods’) used for the highly serviced and more repeatable areas such as kitchens and bathrooms, utility cupboards, risers, plant rooms as well as pre-formed wiring looms, mechanical engineering composites would fall into this category.
‘Conventional masonry site constructed schemes utilising conventional building products such as windows and or door-sets – which might otherwise be part of the fabrication process in the other pre-manufacturing categories – should not be included as sub-assemblies or components in this category unless there is a further level of consolidation from traditional configurations. Also excludes and structural base elements that composite assemblies are fixed to and which are to be included in Cats 1-4. Any structure in this category is purely to support the sub-assembly in transit / install phase.’
[edit] Related articles on Designing Buildings Wiki
- British post-war mass housing.
- Design for deconstruction.
- Design for Manufacture and Assembly (DfMA).
- MMC definition framework.
- Modern methods of construction.
- Off site, on track.
- Off-site construction.
- Off-site prefabrication of buildings: A guide to connection choices.
- Prefabrication.
- Pre-manufactured value
- Volumetric.
Featured articles and news
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure Bill
An outline of the bill with a mix of reactions on potential impacts from IHBC, CIEEM, CIC, ACE and EIC.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.